Rehabilitation of Al-Tadamon Water Network - Image 1
1 / 4
Infrastructure & Water ManagementOngoing

Rehabilitation of Al-Tadamon Water Network

Al-Tadamon Neighborhood
In Progress

Project Description

This significant infrastructure project involves the extensive rehabilitation of the water supply network across the Al-Tadamon neighborhood. The scope of work encompasses meticulous excavation of existing roadways to access buried pipelines, systematic replacement of old and deteriorated pipes with new, high-quality, and durable materials, and the precise installation of modern valves and advanced connection fittings. The project utilizes heavy construction machinery including excavators and skid-steer loaders for efficient earthmoving and site preparation. Our team implements comprehensive safety measures with traffic cones, barrier tape, and proper site cordoning to ensure public safety during construction. The objective is to establish an efficient and reliable water distribution system, significantly improving water quality, drastically reducing water leaks, and enhancing the overall reliability of water supply for the local community. The rehabilitation includes installation of modern polyethylene (PE) pipes with leak-proof compression fittings, new control valves for network management, and proper bedding materials for long-term durability. This vital upgrade to the urban water infrastructure ensures long-term benefits for residents and represents a commitment to improving public services and quality of life.

Key Features

Extensive excavation and trenching for pipeline access
Replacement of old pipes with modern, durable materials
Installation of new control valves for network management
Advanced leak-proof pipe connection fittings
Utilization of skilled labor and heavy construction machinery
Comprehensive on-site safety protocols and measures
Modern polyethylene (PE) pipe installation
Improved water quality and supply reliability for residents

Project Specifications

Location
Al-Tadamon Neighborhood
Category
Infrastructure & Water Management
Year
2024
Size
Neighborhood-wide
Units
Multiple Sections
Floors
N/A
Completion Date
In Progress
Get In Touch